Why solar in Gilan?
If you live in Gilan you know the scheduled summer outages: a fridge that sits dark for hours, a router that cuts off work and school, a water pump that stops. A hybrid solar system is built for exactly this. While the grid is up, part of your use comes from the sun; when it drops, the house moves to battery without a pause.
People often ask whether solar makes sense with so much rain and cloud. Honestly, annual yield in Gilan is lower than in Iran's sunny interior, but the cooler air helps panel efficiency, rain keeps the glass clean, and the real value of a system here is keeping the lights on during blackouts.
Which system suits Gilan?
- Hybrid: for most homes, apartments, shops and villas with a grid connection. Lower bills and power during outages.
- Off-grid: for gardens, mountain villas and farms without grid power, from the highlands of Talesh and Masal to the tea gardens of Lahijan.
- Lithium backup without panels: for apartments with no roof space, such as many flats in central Rasht.
Technical notes for Gilan's climate
Gabled roofs
Most Gilan villas have gabled metal roofs. We mount panels with dedicated clamp structures and fully seal every fixing so the roof stays watertight.
Salt air on the coast
In Bandar Anzali, Astara, Kiashahr, Langarud and Rudsar, salty air quickly corrodes ordinary steel. Our standard is hot-dip galvanised structures, stainless fasteners, sealed connectors and inverters and batteries mounted under cover.
Cloud and mist in the foothills
In the foothills and highlands we size panels conservatively and batteries generously, so essential loads are covered through several cloudy days in a row.
The sunny Sefidrud valley
Rudbar and Manjil get more sun than the coastal strip, so each kilowatt of panels produces more. In exchange, the valley wind calls for a stronger structure and fully restrained cabling.
What does it cost?
Price depends on panel capacity, battery size and chemistry, inverter type and the installation itself. The 'Independent Home' package, with a 5 kW hybrid plant, a 5 kWh lithium battery and app monitoring, starts from 165 million toman and can be paid in up to 18 instalments with 30% down.
How installation works
- Free phone consultation on 0903 413 8696
- On-site survey and measurements in your town
- Design and a transparent quote within 48 hours
- Installation and handover in 1 to 3 days, with full training